The Leeuwfontein Project which is a nine-hectare property about 35 kilometres to the south of Middelburg. A Measured Coal Resource of 922 000 tonnes (MTIS) of open-pittable coal has been declared and is included in the Coal Resource and Reserve Statement. The Board has resolved that an application for a mining right be prepared and submitted with a view to bringing the project into production in 2010. The project will be very similar to the existing Klip Colliery and will have a relatively short life of about 18 months with run-of-mine coal likely to be sold for processing elsewhere.
| Seam | Density | Average Width (m) | Volume (m3) | Tonnage (GTIS) (‘000 t) | Tonnage (MTIS) (‘000 t) | Category |
|---|---|---|---|---|---|---|
| 4 | 1.69 | 2.64 | 201,828 | 342 | 290 | Measured |
| 1/2 | 1.59 | 5.80 | 467,084 | 744 | 632 | Measured |
| Total | 668,912 | 1,086 | 922 | Measured |